Bid Letting Dates
Click on the PDF documents to view.
TIF No. 9 Utility Relocation Project at Williams Street/Lower Main Street (Highway 85) Deadwood Tax Increment Financing District No. 9
Deadwood, SD
PROJECT |
DATE |
TIME |
OWNER |
LOCATION |
PROJECT MANAGER |
PLANS CHARGE |
TIF No. 9 Utility Relocation Project at Williams Street/ Lower Main Street |
02-16-2012 |
2:00 P.M. MST |
Optima. LLC |
Deadwood, SD |
Ted Schultz, P.E. |
No Deposit |
|
Planholders List: Planholders List Please note: The planholders named on this list have obtained plans from CETEC Engineering Services, Inc. There may be additional plan holders who obtain plans from the Construction Industry Center. The CIC's Planholders List can be viewed at www.constructionindustrycenter.com. |
Addenda: Addendum 1Addendum 2 |
Bid Letting Results: |
|
|
|
|
Greenway Trails and Pedestrian Facilities
Rapid City, SD
PROJECT |
DATE |
TIME |
OWNER |
LOCATION |
PROJECT MANAGER |
PLANS CHARGE |
| Greenway Trail & Pedestrian Facilities |
12-08-2011 |
2:00 PM MST |
City of Rapid City |
Rapid City, SD |
Brian Tideman, P.E. |
No Deposit |
Request Plans and Specs: Available at the City of Rapid City Engineering Services Office |
Planholders List: Planholders List
Available from the City of Rapid City Engineering Services Office |
|
|
|
|
Prebid Conference Minutes & Sign-in Sheet |
|
|
|
Main/East Campus Lift Station Upgrades, STAR Academy
Custer, SD
PROJECT |
DATE |
TIME |
OWNER |
LOCATION |
PROJECT MANAGER |
PLANS CHARGE |
| Main/East Campus Lift Station Upgrades |
11-22-2011 |
4:00 PM CST |
Department of Corrections |
Custer, SD |
Greg Wierenga, P.E. |
No Deposit |
|
Planholders List: Planholders List
Please note: The planholders named on this list have obtained plans from CETEC Engineering Services, Inc. There may be additional plan holders who obtain plans from the Construction Industry Center. The CIC's Planholders List can be viewed at www.constructionindustrycenter.com. |
|
|
|
|
|
|
|
|
Trustee Unit Sewer Upgrades, STAR Academy
Custer, SD
PROJECT |
DATE |
TIME |
OWNER |
LOCATION |
PROJECT MANAGER |
PLANS CHARGE |
| Trustee Unit Sewer Upgrades |
11-22-2011 |
3:00 PM CST |
Department of Corrections |
Custer, SD |
Greg Wierenga, P.E. |
No Deposit |
|
Planholders List: Planholders List
Please note: The planholders named on this list have obtained plans from CETEC Engineering Services, Inc. There may be additional plan holders who obtain plans from the Construction Industry Center. The CIC's Planholders List can be viewed at www.constructionindustrycenter.com. |
|
|
|
|
|
|
|
|
RVSD High-Level Booster Pump Station
Rapid City, SD
PROJECT |
DATE |
TIME |
OWNER |
LOCATION |
PROJECT MANAGER |
PLANS CHARGE |
| RVSD High-Level Booster Pump Station |
9-20-2011 |
2:00 PM MDT |
Rapid Valley Sanitary District - Water Service |
Rapid City, SD |
Rich Marsh, P.E. |
$50 Refundable Deposit
for requests from outside of South Dakota |
|
Planholders List: Planholders List
Please note: The planholders named on this list have obtained plans from CETEC Engineering Services, Inc. There may be additional plan holders who obtain plans from the Construction Industry Center. The CIC's Planholders List can be viewed at www.constructionindustrycenter.com. |
|
Bid Summary
|
|
|
|
|
Sturgis Water System Improvements (Phase 1 - Water Main Replacement Project)
Sturgis, SD
PROJECT |
DATE |
TIME |
OWNER |
LOCATION |
PROJECT MANAGER |
PLANS CHARGE |
| Sturgis Water System Improvements - Phase 1 Water Main Replacement Project |
9-01-2011 |
10:00 AM MDT |
City of Sturgis Municipal Utility Board |
Sturgis, SD |
Brian Tideman, P.E. |
$50 Refundable Deposit
for requests from outside of South Dakota |
|
Planholders List: Planholders List
Please note: The planholders named on this list have obtained plans from CETEC Engineering Services, Inc. There may be additional plan holders who obtain plans from the Construction Industry Center. The CIC's Planholders List can be viewed at www.constructionindustrycenter.com. |
|
|
|
|
|
|
Main Street Reconstruction (Fifth Avenue to Seventh Avenue)
Wall, SD
PROJECT |
DATE |
TIME |
OWNER |
LOCATION |
PROJECT MANAGER |
PLANS CHARGE |
| Main Street Reconstruction |
7-06-2011 |
2:30 PM MDT |
City of Wall |
Wall, SD |
Ted Schultz, P.E. |
$25 Refundable Deposit
for requests from outside of South Dakota |
|
Planholders List: Planholders List
Please note: The planholders named on this list have obtained plans from CETEC Engineering Services, Inc. There may be additional plan holders who obtain plans from the Construction Industry Center. The CIC's Planholders List can be viewed at www.constructionindustrycenter.com. |
|
|
|
|
|
|
Standby Generator Procurement
Sturgis, SD
PROJECT |
DATE |
TIME |
OWNER |
LOCATION |
PROJECT MANAGER |
PLANS CHARGE |
| Standby Generator Procurement |
6-02-2011 |
10:00 AM MDT |
City of Sturgis Municipal Utility Board |
Sturgis, SD |
Brian Tideman, P.E. |
$25 Refundable Deposit
for requests from outside of South Dakota |
|
Planholders List: Planholders List
Please note: The planholders named on this list have obtained plans from CETEC Engineering Services, Inc. There may be additional plan holders who obtain plans from the Construction Industry Center. The CIC's Planholders List can be viewed at www.constructionindustrycenter.com. |
|
|
|
|
|
|
Marshall Street Water Main Replacement
Sturgis, SD
PROJECT |
DATE |
TIME |
OWNER |
LOCATION |
PROJECT MANAGER |
PLANS CHARGE |
| Marshall Street Water Main Replacement |
4-07-2011 |
2:00 PM MDT |
City of Sturgis Municipal Utility Board |
Sturgis, SD |
Ted Schultz, P.E. |
$25 Refundable Deposit
for requests from outside of South Dakota |
|
Planholders List: Planholders List
Please note: The planholders named on this list have obtained plans from CETEC Engineering Services, Inc. There may be additional plan holders who obtain plans from the Construction Industry Center. The CIC's Planholders List can be viewed at www.constructionindustrycenter.com. |
|
|
|
|
|
|
Chapel Lane Water Company Water System Improvements
Rapid City, SD
PROJECT |
DATE |
TIME |
OWNER |
LOCATION |
PROJECT MANAGER |
PLANS CHARGE |
| Chapel Lane Water Company Water System Improvements |
3-17-2011 |
2:00 PM MDT |
Chapel Lane Water Company |
Rapid City , SD |
Ted Schultz, P.E. |
$50 Refundable Deposit
for requests from outside of South Dakota
|
|
Planholders List: Planholders List
Please note: The planholders named on this list have obtained plans from CETEC Engineering Services, Inc. There may be additional plan holders who obtain plans from the Construction Industry Center. The CIC's Planholders List can be viewed at www.constructionindustrycenter.com. |
|
|
|
|
|
|
Nuthatch Road Driveway Repairs
Pennington County, SD
PROJECT |
DATE |
TIME |
OWNER |
LOCATION |
PROJECT MANAGER |
PLANS CHARGE |
| Nuthatch Road Driveway Repairs |
3-15-2011 |
10:00 AM MDT |
Richard Mounce |
Pennington County, SD |
Ted Schultz, P.E. |
No Deposit |
|
Planholders List: Planholders List
Please note: The planholders named on this list have obtained plans from CETEC Engineering Services, Inc. There may be additional plan holders who obtain plans from the Construction Industry Center. The CIC's Planholders List can be viewed at www.constructionindustrycenter.com. |
|
|
|
|
|
|
Wall 2011 Street Improvements
City of Wall, SD
PROJECT |
DATE |
TIME |
OWNER |
LOCATION |
PROJECT MANAGER |
PLANS CHARGE |
| Wall 2011 Street Improvements |
3-08-2011 |
2:00 PM MST |
City of Wall |
Wall, SD |
Brian Tideman, P.E. |
$25 Refundable Deposit
for requests from outside of South Dakota
|
|
Planholders List: Planholders List
Please note: The planholders named on this list have obtained plans from CETEC Engineering Services, Inc. There may be additional plan holders who obtain plans from the Construction Industry Center. The CIC's Planholders List can be viewed at www.constructionindustrycenter.com. |
|
|
|
|
|
|
Fillmore and Ash Street Sewer and Street Reconstruction
City of Whitewood, SD
PROJECT |
DATE |
TIME |
OWNER |
LOCATION |
PROJECT MANAGER |
PLANS CHARGE |
| Fillmore & Ash Street Sewer and Street Reconstruction |
7-22-2010 |
10:00 AM MDT |
City of Whitewood |
Whitewood, SD |
Rich Marsh, P.E. |
$100 Deposit
Refundable |
|
Planholders List: Planholders List
Please note: The planholders named on this list have obtained plans from CETEC Engineering Services, Inc. There may be additional plan holders who obtain plans from the Construction Industry Center. The CIC's Planholders List can be viewed at www.constructionindustrycenter.com. |
|
|
|
|
|
|
Wall 2010 Street Improvements
City of Wall, SD
PROJECT |
DATE |
TIME |
OWNER |
LOCATION |
PROJECT MANAGER |
PLANS CHARGE |
| Wall 2010 Street Improvements |
6-10-2010 |
2:00 PM MDT |
City of Wall |
Wall, SD |
Brian Tideman, P.E. |
$25 Deposit
Refundable |
|
Planholders List: Planholders List
Please note: The planholders named on this list have obtained plans from CETEC Engineering Services, Inc. There may be additional plan holders who obtain plans from the Construction Industry Center. The CIC's Planholders List can be viewed at www.constructionindustrycenter.com. |
|
|
|
|
|
|
|
Lower Williams Street Repair
City of Deadwood, SD
PROJECT |
DATE |
TIME |
OWNER |
LOCATION |
PROJECT MANAGER |
PLANS CHARGE |
| Lower Williams Street Repair |
5-03-2010 |
5:00 PM MDT |
City of Deadwood |
Deadwood, SD |
Brian Tideman, P.E. |
$25 Deposit
Refundable |
|
Planholders List: Planholders List
Please note: The planholders named on this list have obtained plans from CETEC Engineering Services, Inc. There may be additional plan holders who obtain plans from the Construction Industry Center. The CIC's Planholders List can be viewed at www.constructionindustrycenter.com. |
|
|
Bid Letting Results: Contact: City of Deadwood Public Works Director, Jim Raysor
|
|
|
|
|
Saint Andrew Street Reconstruction
Lincoln Avenue to Elm Avenue City of Rapid City Project No. ST10-1803/CIP NO. 50714
PROJECT |
DATE |
TIME |
OWNER |
LOCATION |
PROJECT MANAGER |
PLANS CHARGE |
Saint Andrew Street Reconstruction |
3-09-2010 |
2:00 PM MST |
City of Rapid City |
Rapid City, SD |
Todd Peckosh, P.E. Klare Schroeder, P.E. |
No Deposit
|
Request Plans and Specs: Contact City of Rapid City Finance Officer |
Planholders List: Contact City of Rapid City Engineering |
Addenda:
|
|
|
|
|
|
Well House and Submersible Well Pump for Summit Well
City of Spearfish, SD
PROJECT |
BID DATE |
TIME |
OWNER |
LOCATION |
PROJECT MANAGER |
PLANS CHARGE |
| Well House and Submersible Well Pump for Summit Well |
03-29-2010 |
10:00 AM MST |
City of Spearfish |
Spearfish, SD |
Greg Wierenga, P.E. |
No Deposit |
Request Plans and Specs:
Contact City of Spearfish - 605-642-1333
Kyle Mathis, City Engineer
| Planholders List and Addenda :
Contact City of Spearfish - 605-642-1333 Planholders List |
|
|
Colorado Blvd. Water Main Replacement
City of Spearfish, SD
PROJECT |
BID DATE |
TIME |
OWNER |
LOCATION |
PROJECT MANAGER |
PLANS CHARGE |
| Colorado Blvd. Water Main Replacement |
03-08-2010 |
10:00 AM MST |
City of Spearfish |
Spearfish, SD |
Greg Wierenga, P.E. |
No Deposit |
Request Plans and Specs:
Contact City of Spearfish - 605-642-1333
Kyle Mathis, City Engineer
| Planholders List and Addenda :
Contact City of Spearfish - 605-642-1333
Kyle Mathis, City Engineer |
|
Bid Letting Results:
|
Wastewater Stabilization Pond and Lift Station
Sunshine Bible Academy
PROJECT |
DATE |
TIME |
OWNER |
LOCATION |
PROJECT MANAGER |
PLANS CHARGE |
| Wastewater Stabilization Pond & Lift Station |
12-12-2009 |
|
Sunshine Bible Academy |
Miller, SD |
Rich Marsh , P.E. |
$40 Deposit
Non-refundable |
|
Planholders List: Planholders List
Please note: The planholders named on this list have obtained plans from CETEC Engineering Services, Inc. There may be additional plan holders who obtain plans from the Construction Industry Center. The CIC's Planholders List can be viewed at www.constructionindustrycenter.com. |
Addenda:
|
|
|
|
|
|
Croyle II Well, Well House and Water Main Rapid City, SD
PROJECT |
DATE |
TIME |
OWNER |
LOCATION |
PROJECT MANAGER |
PLANS CHARGE |
| Croyle II Well , Well House and Water Main |
12-03-2009 |
2:00 P.M. MST |
Colonial Pine Hills Sanitary District |
Rapid City, SD |
Ted Schultz, P.E. |
$50 Deposit
Refundable |
|
Planholders List: Planholders List
Please note: The planholders named on this list have obtained plans from CETEC Engineering Services, Inc. There may be additional plan holders who obtain plans from the Construction Industry Center. The CIC's Planholders List can be viewed at www.constructionindustrycenter.com. |
|
|
|
|
Scope of Work |
|
|
RVSD 3rd Microfiltration Skid Upgrade Rapid City, SD
PROJECT |
DATE |
TIME |
OWNER |
LOCATION |
PROJECT MANAGER |
PLANS CHARGE |
RVSD 3rd Microfiltration Skid Upgrade |
12-02-2009 |
2:00 P.M. MST |
Rapid Valley Sanitary District |
Rapid City, SD |
Ted Schultz, P.E. |
$100 Deposit Non-refundable |
|
Planholders List: Planholders List Please note: The planholders named on this list have obtained plans from CETEC Engineering Services, Inc. There may be additional plan holders who obtain plans from the Construction Industry Center. The CIC's Planholders List can be viewed at www.constructionindustrycenter.com. |
|
|
Bid Letting Results:
Bid Summary
|
|
Scope of Work |
|
|
Red Cloud Indian School Wastewater Stabilization Ponds & Sewage Lift Station Pine Ridge, SD
PROJECT |
DATE |
TIME |
OWNER |
LOCATION |
PROJECT MANAGER |
PLANS CHARGE |
Red Cloud Indian School Wastewater Stabilization Pond & Sewage Lift Station |
11-24-2009 |
11:00 A.M. MST |
Red Cloud Indian School |
Pine Ridge, SD |
Greg Wierenga, P.E. |
No Deposit |
|
Planholders List: Planholders List Please note: The planholders named on this list have obtained plans from CETEC Engineering Services, Inc. There may be additional plan holders who obtain plans from the Construction Industry Center. The CIC's Planholders List can be viewed at www.constructionindustrycenter.com. |
|
|
Bid Letting Results: Bid Tabulation
|
|
Pre-Bid Sign-In Sheet |
|
|
Water Treatment System for Well No. 2 New Underwood, SD
PROJECT |
DATE |
TIME |
OWNER |
LOCATION |
PROJECT MANAGER |
PLANS CHARGE |
Water Treatment System for Well No. 2 |
10-29-2009 |
1:00 P.M. MDT |
City of New Underwood |
New Underwood, SD |
Greg Wierenga, P.E. |
No Deposit |
|
Planholders List: Planholders List Please note: The planholders named on this list have obtained plans from CETEC Engineering Services, Inc. There may be additional plan holders who obtain plans from the Construction Industry Center. The CIC's Planholders List can be viewed at www.constructionindustrycenter.com. |
|
|
Bid Letting Results: Bid Tabulation
|
|
|
|
|
Legion Lake Campground Road Construction and Utility Relocation Custer County, SD
PROJECT |
DATE |
TIME |
OWNER |
LOCATION |
PROJECT MANAGER |
PLANS CHARGE |
Legion Lake Campground Road Construction and Utility Relocation |
09-15-2009 |
10:00 A.M. MDT |
Dept. of Game, Fish and Parks |
Custer County, SD |
Ted Schultz, P.E. |
No Deposit |
|
Planholders List: Planholders List Please note: The planholders named on this list have obtained plans from CETEC Engineering Services, Inc. There may be additional plan holders who obtain plans from the Construction Industry Center. The CIC's Planholders List can be viewed at www.constructionindustrycenter.com. |
|
|
Bid Letting Results: Bid Tabulation
Bid Summary
|
|
|
|
|
Yosemite Way Reconstruction and Drainage Improvements
Whitewood, SD
PROJECT |
DATE |
TIME |
OWNER |
LOCATION |
PROJECT MANAGER |
PLANS CHARGE |
Yosemite Way Reconstruction and Drainage Improvements |
07-28-2009 |
10:00 A.M. MDT |
City of Whitewood |
Whitewood, SD |
Rich Marsh, P.E. |
$50 Refundable Deposit |
|
Planholders List: Planholders List Please note: The planholders named on this list have obtained plans from CETEC Engineering Services, Inc. There may be additional plan holders who obtain plans from the Construction Industry Center. The CIC's Planholders List can be viewed at www.constructionindustrycenter.com. |
|
Bid Letting Results: Bid Tab |
|
|
|
|
Sports Complex Water Main
Spearfish, SD
PROJECT |
DATE |
TIME |
OWNER |
LOCATION |
PROJECT MANAGER |
PLANS CHARGE |
Sports Complex Water Main Extension |
07-20-2009 |
1:30 P.M. MDT |
City of Spearfish |
Spearfish, SD |
Rich Marsh, P.E. |
No Deposit |
Request Plans and Specs: City of Spearfish 605-642-1333 |
Planholders List: |
Addenda:
Addenda:
Addenda:
|
Bid Letting Results: |
|
|
|
|
Heritage Park Spraygrounds and Sidewalk Improvements
Spearfish, SD
PROJECT |
DATE |
TIME |
OWNER |
LOCATION |
PROJECT MANAGER |
PLANS CHARGE |
Heritage Park Spraygrounds and Sidewalk Improvements |
06-22-2009 |
1:30 P.M. MDT |
City of Spearfish |
Spearfish, SD |
Greg Wierenga, P.E. |
No Deposit |
Request Plans and Specs: City of Spearfish 605-642-1333 |
Planholders List: Planholders List |
|
Bid Letting Results: |
|
|
|
|
Mountain Plains 2 Water System Well #2 and Well #3 Modifications
Mountain Plains Homeowners Association, Spearfish SD
PROJECT |
DATE |
TIME |
OWNER |
LOCATION |
PROJECT MANAGER |
PLANS CHARGE |
Mountain Plains 2 Water System Well #2 and #3 Modifications |
06-16-2009 |
10:00 A.M. MT |
Mountain Plains Homeowners Association |
Spearfish, SD |
Ted Schultz, P.E. |
No Deposit |
|
Planholders List: Planholders List Please note: The planholders named on this list have obtained plans from CETEC Engineering Services, Inc. There may be additional plan holders who obtain plans from the Construction Industry Center. The CIC's Planholders List can be viewed at www.constructionindustrycenter.com. |
|
Bid Letting Results: Bid Tab |
|
|
|
|
Municipal Water Supply Well
City of Spearfish, SD
PROJECT |
DATE |
TIME |
OWNER |
LOCATION |
PROJECT MANAGER |
PLANS CHARGE |
Municipal Water Supply Well |
06-01-2009 |
1:30 P.M. MDT |
City of Spearfish |
Spearfish, SD |
Greg Wierenga, P.E. |
No Deposit |
Request
Plans and Specs: City of Spearfish 605-642-1333 |
Planholders List: Planholders List |
|
Bid Letting Results: Bid Tab |
|
Pre-Bid Meeting |
|
|
Replace Grease Interceptor System for Kitchen Sewer
State Veteran's Home, Hot Springs, SD
PROJECT |
DATE |
TIME |
OWNER |
LOCATION |
PROJECT MANAGER |
PLANS CHARGE |
Replace Grease Interceptor Sytem for Kitchen Sewer State Veteran's Home |
05-13-2009 |
2:00 P.M. CDT |
State of SD |
Hot Springs , SD |
Greg Wierenga , P.E. |
No Deposit |
|
Planholders List: Planholders List
Please note: The planholders named on this list have obtained plans from CETEC Engineering Services, Inc. There may be additional plan holders who obtain plans from the Construction Industry Center. The CIC's Planholders List can be viewed at www.constructionindustrycenter.com. |
|
Bid Letting Results: Bid Tab |
|
Pre-Bid Sign-in |
|
|
Rapid Valley Sanitary District Water System Improvement
Rapid Valley Sanitary District - Water Services
PROJECT |
DATE |
TIME |
OWNER |
LOCATION |
PROJECT MANAGER |
PLANS CHARGE |
Rapid Valley Sanitary District Water System Improvements |
05-26-2009 |
2:00 P.M. MDT |
RVSD- Water Services |
Rapid City, SD |
Rich Marsh, P.E. |
$100 Refundable Deposit |
|
Planholders List: Planholders List
Please note: The planholders named on this list have obtained plans from CETEC Engineering Services, Inc. There may be additional plan holders who obtain plans from the Construction Industry Center. The CIC's Planholders List can be viewed at www.constructionindustrycenter.com. |
|
Bid Letting Results: Bid Tab |
|
Prequalified Tank Contractors |
|
|
Wall 2009 Street Improvements
City of Wall, SD
PROJECT |
DATE |
TIME |
OWNER |
LOCATION |
PROJECT MANAGER |
PLANS CHARGE |
Wall 2009 Street Improvements |
05-07-2009 |
2:00 P.M. MDT |
City of Wall |
Wall, SD |
Ted Schultz, P.E. |
$25 Refundable Deposit |
|
Planholders List: Planholders List
Please note: The planholders named on this list have obtained plans from CETEC Engineering Services, Inc. There may be additional plan holders who obtain plans from the Construction Industry Center. The CIC's Planholders List can be viewed at www.constructionindustrycenter.com. |
Addenda: Addenda:
Addenda:
|
Bid Letting Results: Bid Tab |
|
|
|
|
Nonanna Well House Filtration Modifications
Colonial Pine Hills Sanitary District
PROJECT |
DATE |
TIME |
OWNER |
LOCATION |
PROJECT MANAGER |
PLANS CHARGE |
Nonanna Well House Filtration Modifications |
04-21-2009 |
10:00 A.M. MDT |
Colonial Pine Hills Sanitary District |
Pennington County, SD |
Ted Schultz, P.E. |
No Deposit |
|
Planholders List: Planholders List
Please note: The planholders named on this list have obtained plans from CETEC Engineering Services, Inc. There may be additional plan holders who obtain plans from the Construction Industry Center. The CIC's Planholders List can be viewed at www.constructionindustrycenter.com. |
Addenda: Addenda:
Addenda:
|
Bid Letting Results: Bid Tab |
|
|
|
|
Spearfish Business and Industry Park Phase II Expansion
City of Spearfish, SD
PROJECT |
DATE |
TIME |
OWNER |
LOCATION |
PROJECT MANAGER |
PLANS CHARGE |
Spearfish Business and Industry Park Phase II Expansion |
03-27-2009 |
1:30 P.M. MDT |
City of Spearfish |
Spearfish, SD |
Greg Wierenga, P.E. |
No Deposit |
Request
Plans and Specs: City of Spearfish 605-642-1333 |
Planholders List: City of Spearfish 605-642-1333 |
|
Bid Letting Results: Bid Tabulation |
|
|
|
|
|
|